Apr 22
Bid ended
19128 GTRA ARFF Road Full Depth Reclamation (FDR) #17923
(T-NR-E) Work will be that associated with the ARFF Access Road Reconstruction (FDR) project which will involve full depth reclamation of the ARFF access road, concrete flume replacement, storm drainage ditch rehabilitation including regrading, storm pipe replacement, and associated pavement patching.
Plan Holders
| Date | Company | Contact | Bid Categories |
| 4/1/25 1:23 pm |
Construct Connect
3825 Edwards Rd
Suite 800 Cincinatti, OH 45209 |
Rye Jumuad
Planroom
Tel: 323-602-5079
Fax: 866-570-8187
|
Plan Room |
| 3/24/25 8:58 am |
Neel-Schaffer | Birmingham
2 Perimeter Park South
Suite 230 E Birmingham, AL 35243 |
Joshua Stump
Project manager
Tel: 205-912-8549
Fax: 205-397-3900
|
|
| 3/24/25 8:58 am |
PH Bidding Group
605 W. Main St.
Tupelo, MS 38804 |
Stephen Tutor
Plan Room Administrator
Tel: 662-407-0193
|
|
| 4/2/25 5:08 pm |
PHILLIPS CONTRACTING CO., INC.
PO Box 7530
Columbus, MS 39705 |
Tyler Shepherd
Tel: 662-574-2926
Fax: 662-329-3291
|
General Contractor |
| 4/15/25 7:46 am |
R & J Construction Co.
1637 Highway 184
Laurel, MS 39443 |
Scott Hubbard
Estimator
Tel: 6014261042
Fax: 601-426-1044
|
General Contractor |
| 3/24/25 8:58 am |
Statewide Plan Room
605 West Main Street
Tupelo, MS 38804 |
Statewide Plan Room
Tel: 662-407-0193
|
