Feb 15
Bid ended

23-078 Site Development Grant Project at I-59 South Industrial Site - Phase 3 #14948

Jones Co., MS (H-NR-E)

Status

Bidding Closed

Bid Date 2/15/24 2:00pm

Company & Contacts

Pickering Engineering Services, PLLC
Wiley Pickering  
(601) 498-6945

The Economic Development Authority of Jones County will receive sealed proposals at 112 Base Drive, Laurel, Mississippi, until 2:00 p.m. on Thursday, February 15, 2024 for Site Development Grant Project at I-59 South Industrial Site—Phase 3, also known as Engineer's Project No. 23-078. Bids will be opened in the Board Room on the 2nd floor of the Laurel Airport Terminal Building and read aloud. All proposals shall be directed to the attention of Ross Tucker, President & CEO, with the outside of the envelope marked "Bid Proposal for Site Development Grant Project at I-59 South Industrial Site—Phase 3 for the Economic Development Authority of Jones County.” Contractor shall indicate certificate of responsibility number on the outside of the envelope.

The plans, specifications, and contract documents can be viewed and obtained online at www.phbidding.co. By use of the website, the plan holders shall have the option of obtaining physical copies of the plans and specifications and shall have the opportunity to submit an official bid online. Basis of Award: The award, if made, will be to the lowest qualified bidder on the Base Bid Amount. The Owner intends to accept the lowest and best bid and reserves the right to reject any and/or all bids. A Certified check or Bid Bond for FIVE PERCENT (5%) of the total bid payable to The Economic Development Authority of Jones County must accompany each proposal.

Bidders are hereby notified that any proposal accompanied by letter qualifying in any manner the condition under which the proposal is tendered will be considered an irregular bid, and such proposal will not be considered in making the award.

Publish Dates:
Saturday, January 13, 2024
Saturday, January 20, 2024