Nov 7
Bid ended

22100 MCWI Sewer and Water Improvements #14279

Washington Co., MS (H-NR-E)

Status

Bidding Closed

Bid Date11/7/23 10:00am

Company & Contacts

Heflin Engineering
Josh Broome (josh@heflinengineering.com)  
601-824-7569

Location

Glen Allan Utility District

ENGINEER'S ESTIMATE: $250,000

Bids for the construction of the Project will be received at the Washington County Courthouse, 900 Washington Avenue, Room 2, Greenville, MS, 38701, ATTN: Marilyn Hansell, or electronic bids submitted via www.heflinengineeringbids.com until Tuesday, November 7, 2023, at 10:00 am local time. At that time the Bids received will be publicly opened and read aloud. The Project includes wastewater pumps, generators, SCADA and AMR equipment for Glen Allan Utility District’s system in Washington County. The Project has an expected duration of 540 days. Copies of the Plans, Specifications, and other Bidding documents are available for download or in hard copy format from www.heflinengineeringbids.com. Documents must be obtained from the website and such costs are non-refundable. For questions related to the online bidding process, please contact Plan House Bidding Group (662-407-0193). A copy of the plans and specifications may be examined at the office of the Engineer, Heflin Engineering, 1700 W Government St, Building A, Suite J, Brandon, MS 39042. Bid security in the form of a Bid Bond, certified check, or cashier’s check in an amount equal to five percent (5%) of the Bid shall be furnished by each Bidder as required by the Contract Documents. Washington County Board of Supervisors reserves the right to reject any and all Bids and to waive any and all informalities, and reserves the right to hold all Bids for examination for a period not to exceed sixty (60) days and to award Contract to the lowest and best Bid complying with the Plans and Specifications within said time. Funding for the project is through a Mississippi Municipal and County Water Infrastructure (MCWI) Grant. Contractor shall conform to the grant requirement.

WASHINGTON COUNTY BOARD OF SUPERVISORS

Carl McGee, Board President

Publication Dates:

October 4 & 11, 2023